Earthworks for Kediri Airport and an adjacent development

In the early days of the Covid-19 pandemic, on 15th April 2020, officials from the Indonesian government and the East Java province attended a virtual groundbreaking ceremony for a new airport in the Kediri regency. The event marked the official start of construction works that had actually begun three months earlier in January when heavy machines were levelling soil, following several delays that were partly caused by some affected residents refusing to release their land for the project due to unpaid compensation. Fewer than 20 families, in the villages of Bedreck and Bulusari, remained in the area. A villager told The Jakarta Post “If we accept the price, we won’t be able to buy land and build a house of similar value to what we have now”. She said none of the villagers wished to hamper development of the airport, they simply wanted fair compensation. The Kediri administration said that only 0.6 per cent of the 400 hectares of land required to build the airport had not been acquired.

The Kediri Airport project (also referred to as Dhoho Airport) was approved in 2018. The first of the satellite images above shows the airport site area in April 2018, consisting of villages and farmland. The second image shows the same area in June 2020 after earthworks had levelled large areas of land. The third satellite image is from November 2020, by which time earthworks had progressed and impacted upon a larger area, transforming the landscape from verdant green to a pale expanse of crushed and compacted rock. Adjoining this area, extending to the southwest, additional earthworks and construction of roads can be seen. This airport-adjacent development is shown in the fourth and final image in the slideshow, a graphic of the Kediri Master Plan visualising a future tourism and residential complex in this area. Produced by ARKDESIGN Architects and Planners, the ‘MASTER DEVELOPMENT PLAN, PLANTATION RESORT & RESIDENCES’ shows two commercial development areas, a warehouse, utility complex and parking adjoining the airport terminal and cargo buildings. Extending to the southwest is an area allocated for hotels, residences and various tourism facilities including five lakes. Progress of construction of the one of these artificial lakes, near the centre of the planned development, can be seen in the satellite images. The graphic indicates proximity to Mount Wilis, a solitary volcanic massif amidst the surrounding low-lying plains. The route of a future toll road is shown extending from the southeast of the project site, between the airport and the adjacent development.

Controversy over land acquisition for Kediri Airport dates back to 2017, when residents, aware of large-scale land acquisition, questioned whether it was a government or private project. In March 2019 residents of one of the affected villages, Jatirejo, hung dozens of banners along village roads, stating their refusal to accept the prices offered by land buyers for agricultural land, that they said were too low. In October 2019 37 head of family residents of Bedrek Selatan hamlet, Grogol village, had not released their land for the airport project as they had not agreed compensation. The airport plan had caused the price of land around the project site to soar. Land prices had also gone up in Bulusari village where some residents were confused over where to relocate to. Some who had received compensation were experiencing difficulties in finding places to relocate to because of soaring land prices. A shift in the location of the airport runway had required acquisition of additional land, leaving residents with difficulties finding land to relocate to. In January 2020 45 residents of Grogol village rejected land acquisition, protesting over a drop in the compensation offer that would only be sufficient for them to buy land in far away suburbs. Residents’ coordinator said they were being pressured to give up their land for the airport. In February 2020, just two months before the groundbreaking ceremony, some residents had still not agreed to the compensation offers for land acquisition. Ten families were refusing eviction because, while the price of land in their village had dropped drastically, the price of land in new locations where they might settle had risen; they faced the prospect of a huge loss. A resident of Bedrek spoke of repeated visits by land buyers over several months and being pressured to accept the price offered for land.

At the time of writing some residents are still unwilling to leave their homes and suffer the impacts of airport construction works. Several villages – Tarokan, Tiron, Bangkan, Jatirejo and Grogol – have been demolished for the airport project and most of the inhabitants had left. Tugiyem, one of few villagers remaining in Mbandrek Selatan, spoke in the midst of swirling dust and roaring engines of construction vehicles, staring at a pile of dredged rocks. She had lived there since the 1960s and used to work gazing livestock, but her animals were left dying as the construction company had fenced off the land and she could not reach them. A metal fence erected on one side of Grogol, ostensibly to deter trespassing and reduce pollution from construction works, limits residents’ access to their village. One of the main roads connecting Grogol village has been blocked off to aid construction works. This had forced farmers taking their crops to the city to take longer routes and food stalls and shops near the road had to shut down. Within a month of closing access to the road four shops had gone bankrupt. Owners of surviving shops have to rely on custom from their neighbours, including Siti Anggirawan who was forced to close her textile shop. Waiting for customers outside her grocery store, Sri Katun said air quality in Grogol had deteriorated, “When a strong wind blows, construction dust drifts into the house. I often cough.” But she had no thoughts of giving up the land she had bought after years of saving up money, saying, “This house is witness to my ups and downs alongside my husband. We want to die on this land that has been part of our history.”

Earthworks for the airport project consisted of a cut and fill excavation up to 35 metres high. Rivers are being diverted away from the runway via two enormous box culverts, one 570 metres in length and the other 470 metres, made from reinforced concrete. A 3,300 metre runway is being built, to acommodate the largest world’s largest aircraft such as the Boeing 777 and Airbus A350. Construction of the airport proceeds even though plummetting air traffic since the start of the Covid-19 pandemic casts doubts on the feasibility of traffic predictions. And the projections for Kediri Airport, as reported in ACI World Airport Development News, Issue 4 2020, are ambitious. Upon completion of the first phase of construction, scheduled for April 2022, Kediri Airport is projected to handle 1.5 million passengers per annum, eventually rising to more than 10 million annually. A Transport Ministry offical said Kediri Airport would serve domestic flights for tourism, and might also be used for cargo related to possible future agricultural and industrial activity in East Java. Kediri Airport is the first in Indonesia to be fully funded by the private sector. Tobacco company Gudang Garam will spend up to USD732 million to acquire 457 hectares of land and a subsidiary, Surya Dhoho Investama, will oversee development of the airport.

Solidarity with residents resisting eviction for New Yogyakarta International Airport (NYIA)

GAAM has sent a letter in solidarity with residents resisting eviction for New Yogyakarta International Airport (NYIA) and their supporters, urging an end to state repression, intimidation and violence. Road access to the area was cut off in March making it difficult for residents to maintain their economic activities and there were many reports of police brutality injuring several people including elderly women. Land acquisition contravenes residents’ land rights and they have been sent warning letters pressurizing them to leave. Most recently, there was a disproportionate police response to violence by a small number of individuals at a MayDay protest. Many of the 69 people arrested were holding peaceful actions, and were denied their right to legal representation. GAAM sent letters to: President of Indonesia – Joko Widodo, Chief of National Police of Indonesia – Tito Karnavian, Governor of Yogyakarta – Sri Sultan Hamengkubuwono X, Kulon Progo Regent – Hasto Wardodo, President Director of state-owned airport operator Angkasa Pura Airports – Faik Fahmi, Founder and Chairman of GVK, the main investor – Dr. GVK Reddy and a number of Indonesian embassies.

For further information about NYIA see the report Solidarity Calls for Kulon Progo Farmers against Airport and Airport City by People’s Alliance Against Airport and Aerotropolis. An ‘airport city’ is planned around the airport, comprising hotels, shops and other facilities, which would increase the land acquisition and displacement of people. Currently, about 300 residents are holding out in rejecting eviction from their homes and farmland for NYIA, now under construction near the south coast of Java. But there have been many evictions; resistance to land acquisition for NYIA, dates back to 2011 and has been marked by many instances of state repression and intimidation. The most serious occurrence was on 16th February 2016 when police and army overseeing boundary-making subjected residents who gathered to object to the exercise with a ‘violent and brutal attack’. The Asian Human Rights Commission condemned the excessive use of force; people were punched and kicked and some fainted after being choked.

More recently, support for the people resisting eviction for NYIA has come from Indonesia’s National Commission on Human Rights (Komnas HAM). The Commission has accused the government, along with state-owned airport operator Angkasa Pura 1 and the Yogyakarta police, of violating human rights in clearing land for the airport. In a letter the Commission says it suspects that land clearing that took place on 27th and 28th November 2017, marred with destruction of trees and art projects, and disruption of the electricity supply, violated people’s rights to ownership and prosperity. Komnas HAM called on Angkasa Pura 1 and the Kulon Progo police to avoid repressive action and intimidation, urging the airport operator to conduct open dialogue with all the affected residents and accommodate their complaints. There has also been practical support for the residents. After the electricity supply was cut off during the attempted forced eviction for NYIA in November, supporters donated solar panels.

About 300 residents are holding out in rejecting eviction from their homes and farmland for NYIA, now under construction near the south coast of Java. But there have been many evictions; resistance to land acquisition for NYIA, dates back to 2011 and has been marked by many instances of state repression and intimidation. An ‘airport city’ is planned around the airport, comprising hotels, shops and other facilities, which would increase the land acquisition and displacement. For further information see the report Solidarity Calls for Kulon Progo Farmers against Airport and Airport City by People’s Alliance Against Airport and Aerotropolis. Photos of the May 1st protest by farmers’ solidarity organization Jogja Darurat Agraria were posted on Facebook.

Solidarity photos from around the world have been sent to the NYIA affected people, by supporters of the campaign against New Mexico City Airport (NAICM) and a gathering of aviation campaigners, a new network called ‘Stay Grounded‘, held in London.

NYIA, NAICM
Translation of the banner: STOP NYIA, New Mexico City Airport (NAICM) and other destructive megaprojects. STOP THE MEGAPROJECTS OF DEATH
SOLIDARITY between MEXICO and INDONESIA
Greetings to our sisters and brothers farmers in Kulon Progo (Yogyakarta, Indonesia) 
In solidarity,
Frente Amplio No Partidista en contra del Nuevo Aeropuerto y otros Megaproyectos en la Cuenca del Valle de México
La Casa de la Chinampa Photo: La Casa de la Chinampa

Stop NYIA, London April 2018
Campaigners from the UK, Austria, Belgium and The Netherlands at Stay Grounded aviation network meeting in London, 28-29th April 2018. Photo: Stay Grounded

 

Farmers resist land-grabbing for cargo airport in Ogun State, Nigeria

5,000 farmers from 20 villages are being displaced for a cargo airport in Ogun State, Nigeria. Residents of Igbin-Ojo and seven other communities have protested over land-grabbing. Crops have been bulldozed and they fear forcible eviction.

A major cargo airport is planned in the Wasimi area (also referred to as Wasinmi) of Ewekoro Local Government Area of Ogun State, near Nigeria’s southeast coast. On 18th December 2017 hundreds of farmers from the village of Igbin Ojo and seven other communities in Ogun State protested against land-grabbing for the airport. Appealing to the Ogun State Governor Ibikunle Amosun to intervene community leader Ademola Tiwalade Adisa stated that, on three occasions, groups of people came onto their land. Adisa reported that, on 17th November a group of people with a bulldozer invaded their land, then, on 24th November and 8th December a larger group of people encroached onto their land and began mapping portions of it. Below are photos of the 18th December protest published by The Sun Newspaper.

Narrating their ordeal of 8th December 2017 Adisa said that heavily armed men of the Rapid Response Squad (RRS) had forcefully arrested a number of people and, at gunpoint, forced him and his elder brother to sign an undertaking stating that they would not disturb work on their land. Villagers claim that the land trespassing and mapping was led by former chair of the Ewekoro Local Government Area, Mr. Dele Soluade, but he has repeatedly denied all the allegations, dismissing the claims he had illegally invaded the land as “unfounded” and insisting that he was acting under the instructions of Governor Amosun.

Affected villagers had undertaken a survey before the trespassing and mapping exercise began, clarifying the status of their land with the state government. They had obtained a land information certificate dated 13th December 2017 which confirmed that the land in question is completely free of all known acquisitions. The land information certificate was published in the The Sun Newspaper. Farmers’ land rights claims were fortified by this document and Abisa said: “We, therefore, appeal to Governor Ibikunle Amosun to come to our aid before he wipes our communities out in his desperation to grab our lands.”

Farmers dispossessed and crops destroyed

A 4th February an article in The Guardian Sunday Magazine painted an alarming picture of the plight of residents of Igbin Ojo, ‘fighting the battle of their lives’ to resist displacement from their ancestral land. Over the course of a few weeks crops worth millions of Naira, including cassava and pineapple plantations, had been destroyed by bulldozers and caterpillars. Farmland measuring nearly 164 hectares serving as their providing main source of income had been leveled and forcibly taken away. Fear had enveloped other farmers, including people who had invested heavily in poultry facilities which they feared losing. Farmers were distraught, dispossessed of their land and anticipating being evicted from their homes, desperately worried about their own survival and the future for their children. One woman said that that the entire community was living in fear and hunger and that children were unable to attend school because parents were unable to afford the fees.

One of the community elders, Pa Emmanuel Olukunle Opeagbe, said that the community had enjoyed ownership of the land from time immemorial up until 17th November 2017 when the first land invasion took place. He confirmed community leader Abisa’s account of land invasions by a group of people, which he described as “fierce-looking thugs”, and a bulldozer. He backed up community leader Adisa’s allegations of Soluade leading the land invasions and resorting to abuse, harassment, intimidation and threats to bulldoze people along with the crops. Opeagbe reported that Soluade had told villagers that their community would cease to exist. Along with Adisa, Opeagbe had been arrested and forced at gunpoint to sign an undertaking not to interfere with trespassing on the land.

Residents appealed to the Federal Government, Amnesty International and human rights activists for support. On 16th February the Civil Liberties Organisation (CLO) responded, petitioning Governor Amosun over the unlawful acquisition of land and threat to their lives. State chair of CLO, Joseph Enitan, said intervention of the governor is urgently needed because Soluade is acting under his instructions to trespass and grab lands. Farmland was being invaded and destroyed, in the name of constructing a cargo airport. Community members including council chairman Kehinde Adepegba were shocked by recent developments. New areas of land had been claimed for the airport project and encroached upon, even though the land required for the airport was allocated to the project many years previously.

A large portion of land had already been acquired for the proposed Ogun cargo airport, which was first conceived in 2005. Yet, shortly before the reports of land grabbing, in May 2017, the project languished abandoned; the only physical infrastructure that had materialized was a perimeter fence around an area of land measuring 5 x 5 kilometers. Farmers from about 35 communities, who had grown crops like rice and high-yield cassava had been displaced for the project, but they had not received compensation for the loss of their land and livelihoods. Opeagbe said the large portions of land that were “compulsorily taken for the project years back are yet to be compensated for” and that people had not protested against the airport because they believed it would bring development to their area and they would benefit from it.

Farmland is being destroyed, and farmers displaced, for an airport project which aims to export farm produce; the Ogun airport project has been described as an ‘agro-cargo airport‘. It appears that the primary purpose of the airport is envisaged as ‘transportation of agricultural products to other parts of the world’, also referred to as export of perishable (temperature controlled) goods. Only cursory mention has been made of other potential functions for the airport such as import of consumer goods, machinery and industrial raw products, pilot training school, aircraft maintenance facility, helicopter and air taxi services.

Compensation and a possible court case

At the end of February Governor Amosun announced that 500 million Naira (nearly US$1.4 million) had been allocated for payment of compensation to farmers losing their land for the airport, saying that the money would be disbursed to 20 villages directly affected by the airport project. He also said that affected farmers would be relocated to an appropriate location where they could continue their farm business, making assurances that his administration would not bring hardship to the people. It was then reported that 1,000 farmers had been compensated for loss of their agricultural land and crops and the remaining 4,000 would receive compensation within the next few weeks. If it is indeed the case that US1.4 million has been earmarked for compensation of 5,000 farmers, then assuming the same amount is to be allocated per farmer this adds up to a mere US$280 each. Igbin Ojo is one of the villages listed as beneficiaries of the first phase of compensation, along with Pataleri, Igbagba, Mosan, Igbin Orola, Igbin Arowosegbe, Idele and Balagbe.

Since this announcement GAAM has not found any reports of affected villagers’ response to the compensation offer, aside from a single resident of Igbagba village reportedly appreciative of prompt payment. There have been newspaper reports of officials making statements urging people to support the project, and exhorting its supposed benefits of employment for local people, economic development and attracting foreign investors. But it is evident that land acquisition for the airport is not supporting development, it is destroying communities. As officials proclaim potential positive impacts of the airport GAAM has not found any information on such vital matters as how the project will be funded and which firms and/or government bodies will be responsible for constructing, operating and managing the facility. But it is evident that a truly gargantuan megaproject is in the works. As he again implored residents to support the cargo airport Governor Amonsun said that ‘thousands of hectares‘ would be required for the project.

Communities resisting loss of their land for Ogun cargo airport are dragging Soluade to court in an attempt to bring the land grabbing to a halt. Their struggle has parallels with farmers’ resistance to the Ekiti airport project, north of Ogun state. In October 2015 the state government of Ekiti sent in bulldozers to clear 4,000 hectares of farmland for an airport, without even discussing the project with affected farm owners in five villages. Farmers succeeded in stalling the land clearance and suspending the airport project. Opponents from within the state government supported the farmers, arguing that the project had begun illegally without adhering to due process and criticized the high level of state funding. The farmers protested and filed a suit seeking damages for unlawful land acquisition, and in March 2016 were vindicated with a court victory upholding their claims. But in the interim ten Ekiti farmers died. Community members attributed their deaths to the terrible trauma of the injustice perpetrated by the state.

Report – Kulon Progo farmers against airport and aerotropolis

A new report ‘Solidarity Calls for Kulon Progo Farmers against Airport and Airport City‘ about farmers’ resistance against eviction for New Yogyakarta International Airport (NYIA) gives many insights into one of Indonesia’s key land rights struggles. Opposition to the airport dates back to 2011. The site, on the south coast of Java, comprises six villages which, before eviction commenced, hosted 11,501 residents. Farmers worked for many generations to increase the fertility of the land, establishing successful farms and thriving communities. Eviction from farmland means many thousands of agricultural labourers also lose their livelihoods and excavation of coastal areas has destroyed fishing farmers’ ponds.

The megaproject was approved without the requisite Environmental Impact Assessment (EIA) even though there are serious ecological concerns, including the destruction of sand dunes which act as a bulwark protecting from coastal erosion and tsunamis and prevention salinization of groundwater. The report includes a map of the tsunami hazard area. Cultural heritage, such as the Glagah Stupa historical Buddhist site and Mount Lanang prayer monument, is also being obliterated.

The report is filled with striking photographs showing the progress of the airport and the resistance: bulldozers at work clearing land for the airport and the devastation that is left behind, evictions and protest actions including roadside banners, marches, blocking bulldozers, a road block and a hunger strike. Infographics show the projected development of NYIA not just as airport infrastructure but as an airport city, the affected areas of construction and inhabitants, and the food crops (approximately 450 tonnes annually per hectare including melons, eggplant and chilies) and livelihoods being displaced by the airport.

The airport project has divided the community. Many citizens have refused to sell their land for the airport, whilst some are willing to sell their land for compensation. Supporters of the airport worked to widen the social, economic and political rifts, facilitating the project. Resistance to land acquisition has met with state intimidation, repression and criminalization. Four farmers were imprisoned for four months. The report contains a chronology of violence against local residents resisting eviction and their supporters. Most recently, beginning on 28th November 2017, as another phase of eviction took place, police blocked road access to a group of residents’ homes, cut off their electricity supply, destroyed plants in their gardens and intimidated them. Police attacked a woman causing bruising on her neck and a number of citizens supporting the residents experienced violence at the hands of police, one person suffered a head injury and another suffered injuries from being dragged along the road.

An ‘airport city’ or aerotropolis – comprising shopping malls, offices, hotels, golf resort, tourism village, leisure town, industrial park and residential areas – is planned around the new airport, increasing the land area to 2,000 hectares and potentially leading to eviction of even more citizens. A new solidarity organization Paguyuban Warga Penolak Penggusuran Kulon Progo (PWPP-KP), has been formed to oppose the airport and airport city, allied with an organization of neighbouring farmers resisting sand mining, and supported by many citizens and environmental groups, including Jogja Darurat Agraria.

Courageous resistance to forced eviction for New Yogyakarta International Airport

On the morning of 27th November 400 officials – police, army and representatives of Indonesia’s state-owned airport developer PT Angkasa Pura I – arrived to survey land for New Yogyakarta International Airport (NYIA) in the Temon District in the Kulonprogo Regency, on the south coast of central Java. An attempted land grab for the airport, and the courageous resistance of residents resisting forced eviction is documented in a video by Jogja Darurat Agraria. In the space of just two days bulldozers have wreaked devastation reminiscent of a powerful earthquake that struck the island of Java in 2006. Parts of some houses have been destroyed and trees and plants uprooted leaving bare earth.

The land does not belong to PT Angkasa Pura I and residents are refusing to leave or to sell their property. Officials, some of them armed with guns, inform the residents that they will register their houses and instruct them to vacate, and that they have been instructed to clear the land, to tear down everything, by 4th December. But 300 residents are refusing to sell the land passed on to them by their ancestors. Their livelihoods depend upon the farming that they are determined to continue, their values embedded in the culture and nature of the southern coast area.

Women play a prominent role in resisting the forced eviction for the new airport, they stand their ground against the intimidation of large numbers of male officials, facing down heavy verbal aggression, refusing to obey commands, refuting claims that the airport is for their economic benefit and asserting their right to remain in their homes. A crowd of officials confront another woman on her doorstep, try to push the door down, shout at her to get out and try to force their way into her house. She shouts out to the officials that their role is to protect civilians. Then some men begin to wrench open the door. Another woman, also confronted by officials at her door, says that they told her that received three warnings of the impending eviction, she denies this and insists that she did not receive any warning.

Officials are shown cutting off the electricity supply to some of the houses. This move is intended to amplify the threat of destruction and make other residents give up their resistance to eviction, dismantle their homes to salvage whatever they can, and vacate the area. Jogja Darurat Agraria posted photos on Facebook showing villagers gathering to witness and resist the bulldozers at work and the severing of electrical supplies.

The Indonesian government’s attempt to evict Kulon Progo villagers from their homes and farmland at this particular time, beginning on 27th November 2017, adds irony to insult and intimidation; 29th November is designated by the United Nations as the International Day of Women Human Rights Defenders. A video posted on 28th November shows distressed residents – women, men and children – bravely standing and lying in the path of the bulldozers as roofs are ripped off houses and trees uprooted. They are dragged away by officials. Cutting off electricity supplies continues.

The new airport is a key project of the Indonesian government, led by President Joko Widodo, which is pushing for accelerated infrastructure development. PT Angkasa Pura I claims that the process of land acquisition and clearance for NYIA is under control. In reality a land grab is taking place. Forcible eviction for the airport is a shameful and serious abuse of human rights and the very opposite of the government’s stated commitment to achieving the United Nations Sustainable Development Goals (SDGS), specifically SDG 11: Make cities and human settlements inclusive, safe, resilient and sustainable.

The struggle against eviction for New Yogyakarta International Airport dates back to 2011. The site comprises six villages, 2,875 households with 11,501 residents, most of whom sustain agricultural livelihoods cultivating many crops in the fertile soil, including watermelons, chillie peppers and eggplant. Construction of the mega-project commenced and continues without approval of an Environmental Impact Assessment (EIA) and there are serious concerns that destruction of sand dunes will make the coastline more vulnerable to erosion and flooding. An aerotropolis around the airport is planned, a 2,000 hectare ‘airport city’ containing hotels and other tourism facilities, shopping malls and industrial zones.

Authorities have perpetrated repeated acts of repression and violence against villagers resisting displacement for NYIA, which, in its pre-construction phase, was referred to as Kulon Progo Airport. The worst incidence occurred on 16th February 2016. Police and army officers overseeing a boundary-marking procedure subjected a number of residents who had gathered to voice their objections to a vicious and brutal attack. People were choked, kicked and trampled on. The case was taken up by the Asian Human Rights Commission which condemned the excessive use of force and called for prosecution of the officers who were in charge of the exercise.

Resisting Kulon Progo Airport – inspirational artwork

Artwork galvanizes local campaigns, and bridges language barriers, forming a powerful tool for building international communication and solidarity. The resistance campaign against Kulon Progo Airport in Indonesia, also called New Yogyakarta International Airport (NYIA) offers some striking examples. Residents of six coastal villages have resisted eviction from their homes and farmland for the airport since 2011. The text on the poster on the right of the top row translates as ‘We strongly condemn destroyers of the healthy environment. We prosper without an airport and mining’, linking the campaign with the grassroots struggle against iron mining. Watermelons are depicted destroying a plane, because this is one of the key crops grown on the site earmarked for the airport, along with squash, eggplant (aubergine), peppers, rice and maize. The anti-eviction struggle intensified on 28th August. Without warning, construction equipment escorted by hundreds of police entered the site, displacing residents and destroying farmland. Citizens attempted to block the entry of the equipment, but were outnumbered by police.

An ‘airport city’  or ‘aerotropolis’ is planned around Kulon Progo Airport, threatening more evictions and the loss of more farmland. The poster on the bottom right brings together the Kulon Progo airport and aerotropolis resistance with the struggle against a similar megaproject, Kertajati Airport, that is already under construction 300 kilometers away near the northern coast of West Java. Kertajati Airport, also referred to as BIJB (Bandara Intenasional Jawa Barat), is the first phase of a major aerotropolis scheme on a 50 square kilometre site which is predominantly fertile agricultural land. Residents of ten villages have been evicted from their homes and productive farmland for Kertajati Airport and in 2016 residents of an eleventh village, Sukamulya, resisted a series attempts to measure their land for the project. Citizens’ resistance against eviction for Kulon Progo and Kertajati airports is supported by Jogja Darurat Agraria. T-shirts with anti-Kulon Progo Airport / airport city artwork have also been produced

Indonesia: Report on the Struggle Against ‘New Yogyakarta International Airport’ (NYIA) in Kulon Progo

An update on eviction of farmers for a new airport in Kulon Progo, Indonesia, calling for international solidarity with communities resisting displacement, especially from India as Indian conglomerate GVK is an investor in the project.

Insurrection News

Received on 20.08.17:

Since 8 August last week, particularly in Macanan Glagah area and 10 August heavy machinery were already operating within the compromised area (the area in which some community of peasants already sell their land and compromised with the project, although their relocation still unsure) for the development of NYIA. Despite community and peasant resistance against NYIA, the government and PT Angkasapura, cooperating
with this large company from India as the airport major investor: GVK corporation. (We urge comrades in India to communicate with us and build international solidarity)

Mainstream coverage of past struggle against NYIA in English:

http://www.thejakartapost.com/news/2015/10/31/islands-focus-hunger-strike=
-over-kulon-progo-airport-continues.html

http://www.thejakartapost.com/news/2015/05/21/kulon-progo-airport-develop=
ment-violates-human-rights-komnas-ham.html

Grassroot and independent media coverage (Indonesia):

selamatkanbumi.com

Facebook: Jogja Darurat Agraria

PS: The struggle against NYIA is connected to the previous struggle of peasants in Kulon Progo against iron mining in which they won the struggle, not through legal means but through community grassroots struggle (riots…

View original post 84 more words

Yogyakarta, Indonesia: Banner drop Against the Construction of Kulon Progo Airport

Insurrection News

403d10ca-a7e2-4f52-bccb-9d578a52702cReceived on 23.06.17:

KULON PROGO’S MEGAPROJECT, NYIA, AND PEASANTs/COMMUNITY RESISTANCE 1:
Banner-dropping action held yesterday during 5 in the morning on the
train bridge Kewek, Yogyakarta, near Malioboro (A tourists area). Banner
resisting airport construction in the Kulon Progo regions whereas for
years the peasants have been resisting mining companies and the
mega-project including Bandara Temon (Temon Airport) or what is well
known as NYIA (NEW YOGYAKARTA INTERNATIONAL AIRPORT. More detailed
information soon in english and a call for international solidarity
against New Yogyakarta International Airport!

The banner reads as: “Construction of Kulon Progo Airport equals
environmental destruction and the eviction of peasants community.
#YOGYAKARTA IS SPECIAL!

Solidarity!

links:

selamatkanbumi.com

hidupbiasa.blogspot.com

View original post

Airport Expansion in Indonesia: tourism, land struggles, economic zones and aerotropolis projects

Indonesia cover mA new report Airport Expansion in Indonesia: tourism, land struggles, economic zones and aerotropolis projects has been published by the Third World Network (TWN) in partnership with GAAM. Airport expansion in Indonesia is closely intertwined with a government drive for massive tourism growth, and the 64-page report looks at 58 airports, operational, under construction and still in the planning stage.

New airports, and expansion of existing airports, frequently entails displacement of communities and loss of farmland and the report documents land rights struggles relating to 25 airport projects. Planners often hone in on forested land as an alternative to the use of agricultural land for airport projects.

Aviation expansion in Indonesia is integrated with other megparojects such as multi-lane highways and sea ports, and linked to new Special Economic Zones (SEZs). These areas are designated for industrial and tourism development, provided with surface transportation networks and other supportive infrastructure and lavished with tax breaks and other incentives. Several SEZs have been bestowed with long stretches of coastline boasting white sand beaches, natural assets that are a cornerstone of tourism.

There are many plans for aerotropolis-style development, including around two airports currently under construction in Java – Kulon Progo and Kertajati – in the face of vigorous and long standing resistance from communities being forced to leave their homes and productive agricultural land. A number of aerotropolis plans are integrated with development of tourist resorts that aspire to become aviation dependent destinations in their own right. The report accompanies GAAM’s digital map which features all the airports that are mentioned, integrating spatial information with text and images.

Since the report went to print plans for a new airport in the Seribu Islands (Thousand Islands) off the coast of Jakarta have been announced. This appears to be a scheme for tourism oriented aerotropolis style development as the Jakarta administration has stated that the winner of the tender will be permitted to build resorts near the airport, and will be provided with incentives.

For paper copies of the report, please contact:  Third World Network, 131 Jalan Macalister, 10400 Penang, Malaysia, Tel: 60-4-2266728/2266159, Fax: 60-4-2264505, Email: twn@twnetwork.org.